Description
Description And Specification
Product type | IRIS Centering devices & rods |
---|---|
Centering type | Rigid collapsible petals |
Technology | IRIS |
Tube ID range | 11.4 to 18 mm |
Type | Centering device |
IRIS XS centering device (11.4 – 18.0 mm)
LEAD TIME: 1-10 business days (Standard/typical lead time)
Description
IRIS medium centering device (26.0 mm – 42.0 mm)
Description And Specification
Product type | IRIS Centering devices & rods |
---|---|
Centering type | Rigid collapsible petals |
Technology | IRIS |
Tube ID range | 11.4 to 18 mm |
Type | Centering device |
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
IRIS turbine, 8.5mm diameter Compatible With MS5800 and Ectane LEAD TIME: 1-10 days after payment (Standard/typical lead time) Description: IRIS...
IRIS turbine, 8.5mm diameter Compatible With MS5800 and Ectane LEAD TIME: 1-10 days after payment (Standard/typical lead time) Description: IRIS...
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
IRIS medium centering device (23.0 - 42.0 mm) LEAD TIME: 1-10 business days (Standard/typical lead time) Description IRIS medium centering device (23.0...
IRIS medium centering device (23.0 - 42.0 mm) LEAD TIME: 1-10 business days (Standard/typical lead time) Description IRIS medium centering device (23.0...
IRIS Micro Target Pin Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description: IRIS Micro Target Pin
IRIS Micro Target Pin Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description: IRIS Micro Target Pin
IRIS flexible rod for Medium and Large Centralizer Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description:IRIS...
IRIS flexible rod for Medium and Large Centralizer Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description:IRIS...
IRIS spare 45° mirror, 17 mm turbine Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead...
IRIS spare 45° mirror, 17 mm turbine Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead...
IRIS spare rotor, 12 mm turbine Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time)...
IRIS spare rotor, 12 mm turbine Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time)...
IRIS transducer, 10 MHz, 31.8 mm focal length Shipping Time: 30 Days after payment Description: IRIS Transducer, 15 MHz, 25.4 mm...
IRIS transducer, 10 MHz, 31.8 mm focal length Shipping Time: 30 Days after payment Description: IRIS Transducer, 15 MHz, 25.4 mm...
More Information Product type IRIS Turbines Included items Mirror, target pin Quantity 1 Technology IRIS
More Information Product type IRIS Turbines Included items Mirror, target pin Quantity 1 Technology IRIS
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description: IRIS Target Pin
IRIS XS centering device Spare Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment Description: IRIS Target Pin
IRIS turbine, 12.0 mm diameter Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
IRIS turbine, 12.0 mm diameter Compatible With MS5800 and Ectane LEAD TIME: 1-7 days after payment (Standard/typical lead time) Description:...
Reviews
There are no reviews yet.